For the complete documentation index, see llms.txt. This page is also available as Markdown.

Work Periods


Work Periods Overview

Welcome to the Work Periods tab in Bloomfilter.ai! This module provides a sprint-level and multi-sprint view of delivery performance. It combines adherence metrics, throughput data, and workflow trends to assess how effectively teams plan, execute, and deliver work over defined work periods (such as sprints).

Use Cases:

  • Sprint reviews and retrospectives to evaluate execution health

  • Program-level insights into delivery consistency

  • Identifying systemic inefficiencies across teams or boards

Work Periods gives teams objective visibility into delivery behavior, not just outcomes. By grounding discussions in execution data, it enables better planning, more predictable delivery, and continuous improvement over time.

This field guide breaks down each key component of the Work Periods page. For each, you'll find:

  • What it is: A clear description of the feature.

  • Use Cases: Practical scenarios where it's most helpful.

  • Why it's Valuable: The business impact and benefits.

Business Value:

Work Periods gives engineering and delivery teams objective, sprint-level visibility into how effectively they plan, execute, and deliver; combining health scoring, flow analysis, and multi-sprint comparison to drive better retrospectives, more predictable commitments, and continuous improvement across the delivery lifecycle.

Use this guide to navigate the tab confidently and unlock insights that drive better decision-making.


How to Navigate Work Periods Module:

Navigation Steps

  1. Select Assessment View (for Individual Sprint Review) or Comparison (to analyze multiple sprints at the same time)

  2. Filter by Board

  3. Select Date Filter

  4. Pre-Defined: Select Predefined start and end dates based on sprints.

  5. Ad-Hoc: Select specific date ranges

  6. Select Work Period(s) and review insights

Located at the top of the Work Periods page, this panelExport Button: In the top right of your screen, allows users to download the current graph as an image, complete with all selected variables.


How to Compare Sprints & Metrics:

What it is: Sprint Comparison allows users to analyze up to six sprints simultaneously using multiple analysis views: Table View, Measure Comparison, and Measures Over Time.

Use Cases:

  • Comparing recent sprints to identify improvement or regression

  • Validating whether process changes had the intended impact

  • Identifying consistency (or volatility) in key delivery metrics

Why it’s Valuable: By enabling side-by-side sprint analysis, this feature helps teams move beyond anecdotal feedback and base decisions on trends and evidence, improving forecasting accuracy and delivery reliability.

Navigation Steps:

  1. Select Comparison at top of page

  2. Select Board

  3. Select up to 6 Sprints on left filter panel

  4. Select Analysis View:

    1. Table View:

    2. Measure Comparison:

    3. Key Measures Over Time:


Work Periods: Assessment

Assessment

What it is: The Assessment view evaluates the efficiency of a single team during a selected sprint. Each sprint receives a health grade based on eight key process measures, with AI-generated insights highlighting notable patterns or risks.

Use Cases:

  • Sprint retrospectives focused on execution quality

  • Coaching teams on planning, readiness, and scope management

  • Identifying root causes behind missed commitments

Why it’s Valuable: Sprint health scoring provides a structured, repeatable way to assess execution beyond velocity alone. It encourages better sprint hygiene and helps teams improve predictability without increasing pressure.

Key Process measures: If you're unsure about what a specific measure entails or how it is calculated, you can simply click on it. This will redirect you to a detailed page

  1. Strategy: Percentage of tasks associated with an epic within the selected date range

  2. Complexity:The average number of points for tasks that are not yet done, are were done after the start of the work period.

  3. Quality: The number of tech debt and bug share to the total number of tasks within the selected date range

  4. Scope: What percentage increase/decrease in scope was committed to this sprint after it started

  5. Readiness: A percentage of how many tasks in the sprint are "ready" Ready is defined as having a name, description, and points. However, only bugs need a name and description if the associated board setting indicates bugs should not be pointed out.

  6. Independence: Percentage of tasks not blocked by another task.


Work Phase Distribution

What it is: Work Phase Distribution visualizes how tasks move through workflow stages (e.g., Ready, Blocked, WIP, Review, Test, Deploy, Done) during a sprint. Users can view this by task count or points and switch between chart and task-flow views.

Use Cases:

  • Identifying workflow bottlenecks (e.g., review or testing delays)

  • Understanding where work spends most of its time

  • Analyzing flow efficiency during retrospectives

Why it’s Valuable: This view makes invisible workflow friction visible. By highlighting delays and imbalances across phases, teams can optimize flow, reduce cycle time, and improve overall throughput.

Users can switch between # of tasks or points view in the top right and also switch between a chart view and a task flow view which allows teams to see where each task was on a given day


Work Pace

What it is: Work Pace shows completed work relative to originally planned work over time, offering a view into long-term delivery consistency and planning accuracy.

Use Cases:

  • Evaluating whether teams consistently over- or under-commit

  • Assessing stability across multiple sprints

  • Supporting long-term capacity and roadmap planning

Why it’s Valuable: Work Pace shifts the focus from isolated sprint outcomes to sustained performance. It helps organizations balance ambition with realism, leading to healthier teams and more reliable delivery forecasts.


Delivery Confidence

What it is: Delivery Confidence compares completed work against committed scope while tracking scope changes throughout the sprint. Confidence bands reflect historical delivery ranges based on prior sprints.

Use Cases:

  • Forecasting sprint outcomes mid-sprint

  • Identifying risk introduced by scope creep

  • Improving trust in delivery commitments

Why it’s Valuable: This feature connects planning discipline with execution outcomes. By visualizing confidence ranges and scope changes, teams can proactively manage risk and improve predictability over time.

Legend:

Green line is completed work items on a given day

Purple band shows to scope increase from beginning of sprint to end Confidence band which shows your upper and lower deliver over the past 16 sprints


Work Periods: Comparison

Table View

What it is: The Table View presents key metrics and trends across selected sprints in a structured, side-by-side format.

Use Cases:

  • Comparing performance metrics across sprints quickly

  • Identifying trends in readiness, scope, or complexity

  • Supporting leadership or delivery health reviews

Why it’s Valuable: The table provides a concise, factual baseline for sprint comparison, enabling fast analysis without needing to interpret multiple charts.


Measure Comparison

What it is: Measure Comparison allows users to visualize up to four metrics across selected sprints using line or bar charts. Metrics include scope creep, readiness, acceptance rates, velocity, and complexity.

Use Cases:

  • Evaluating tradeoffs between quality, speed, and scope

  • Tracking the impact of process changes

  • Identifying correlations between different delivery metrics

Why it’s Valuable: This view helps teams understand how metrics interact over time, encouraging balanced decision-making instead of optimizing for a single outcome like velocity.


Measures Over Time

What it is: Measures Over Time enables users to track a single metric day-by-day within each sprint, highlighting how it evolves throughout the work period.

Use Cases:

  • Monitoring scope changes during a sprint

  • Identifying late-stage instability or churn

  • Analyzing execution patterns within the sprint lifecycle

Why it’s Valuable: Day-level visibility helps teams detect issues early rather than after the sprint ends. This supports proactive intervention and continuous improvement within active work periods.

Last updated